Contact us on: 01904 692200

CAFCASS, Newcastle

This project was a two phase refurbishment of existing office accommodation to re configure the layouts to accommodate further staff being based at the location. The works were undertake in two halves so that the facility could remain operational throughout the works. Partition and ceiling removal were undertaken along with the installation of new accoustic partitions, reception desk and hatch, electrical alterations and new floor coverings and decoration.

Click here to go back

Website by Fusion Design and See Green